May 08, 2026

Smart Meter Installer

Job Description

Day Rate: £245 - for 2.5 jobs completed per day (e.g. 2x Dual & 1 Single Installation / transactional jobs) Bonus: + £35 for any jobs completed over 5 per day, - £35 for any jobs completed under 2.5 per day. Uncapped commission. Introduction • Full end to end installation of Electric & Gas smart meters, including commissioning and transactional work. • Engineers will receive a minimum on 5 jobs per day, for example x2 dual installations and x1 single installation/transactional jobs. • Engineers will have access to national help desks, using a tablet and phone to work through the commissioning process or diagnosing a fault. (MUST be confident using tech) • Big focus on safety, regular visits from managers for HSE assessments and SAE visits. Scope of work • EDI – Electric dumb install • GDI – Gas dumb install • IHD – Ppmid install or exchange • ESR/EDR Electric removal • GSR/GDR Gas removal • De-energise/Re-energise – Isolator install or exchange • ESX – Electrical smart exchange • GSX – Gas smart exchange • ESX- IHD exchange • ESF – Electric smart fault smet1 or smet2 • GSF – Gas smart fault smet1 or smet2 • ESI – Electric smart install (isolator needs fitting) • GSI – Gas smart install (cap meter, leave capped sign) • Comms hub exchange – smet1 or smet2 • Electric smart commission • Gas smart commission Note: All highlighted class as transactional work. Requirements ✓Dual fuel Smart Metering experience (minimum 2 years) ✓CCN1 or CMA1 & MET1 Qualification ✓MOCOPA or Smart Metering qualification (preferred but not essential) – Covered at induction. ✓Strong experience using apps/phones/PDA’s ✓Own Gas Safe Registration ✓Awareness of safety PPE stage 1 and 2, safe isolation and dead tests. ✓And all other standard compliance as per the checklist

IR35 Status

Unknown Status

Apply Now