Jul 24, 2026

Site Manager

Job Description

Gloucester Royal Hospital - Civils / Enabling & Minor Works Package Duration: 5 months Start: ASAP We are currently delivering a predominantly civils-led package at Gloucester Royal Hospital, supported by specialist subcontractors covering steelwork, masonry, joinery, doors and associated building elements. Scope of works includes: Preparation of multiple areas for CFA piling (circa 60 remaining) Installation of ring beams following piling completion Concrete slab construction across multiple areas (circa 120m²) Masonry structure works (circa 100m²), including timber trusses and slate roof coverings Minor internal wall construction Epoxy floor coatings (circa 60m²) Kerbing (circa 100 linear metres) EPDM roofing (circa 14m²) Small canopy extension Replacement of soffits and fascias (circa 33m²) Structural steel elements including wind posts, trimmer beams, and temporary/permanent steel for large generator installations Tarmac surfacing (circa 180m²) Drainage works including French drains, diversions, and new installations to service new structures Installation of metal doors and louvres (circa 15nr)This package combines enabling works, civils and associated minor building elements within an active hospital environment

IR35 Status

Unknown Status

Apply Now